The steel floor slab produced by the 915 floor decking equipment is used for high-rise floor panels. It has the characteristics of high peak and high strength, and it has a good degree of automation and low cost.
The steel floor slab produced by the 915 floor slab equipment has a simple shape and large waviness. During installation, the welded steel mesh is laid and combined with concrete pouring. The adhesion is good. In high-rise buildings, steel formwork can be omitted and it can reduce the load of the floor, and reduce the amount of steel used in the project under the premise of the same bearing capacity.
1. Manual billet placement and billet removal work procedure: Before using the equipment, check whether the connections are secure, whether the installation bolts and nuts are tightened, and lubricating oil should be added to the left and right chassis before the machine can be powered on for a test run, and the car should be run empty first observe carefully to see if there is any vibration, noise, whether oil is coming from the oil window, and whether the movement of each part is coordinated. The mold can only be installed after it is normal. When installing the mold, cut off the power supply, and manually move the motor belt or large gear to make the workbench rotate. And make the sliding seat rise to the highest point, it is best to use an object to support between the workbench and the bottom surface of the sliding seat, so that the seat will fall naturally, causing an accident.
2. The mold needs one upper mold and six lower molds of the same size. Install the upper mold and one lower mold first. The lower mold is directly installed on the hexagonal wheel workbench. The upper mold is installed on the bottom surface of the slide seat and placed properly. Thick backing plate, after the upper and lower molds are closed, the gap around the periphery is uniform, and the distance between the upper and lower molds is equal to the thickness of the required tile blank. Then the upper mold shall prevail, the workbench shall be rotated, and the remaining five lower molds shall be installed. After all the upper and lower molds are installed, the car can be driven for tile pressing.
3. Automatic feeding and billet taking working procedure: mold installation and main engine test run are the same as above, then start the air compressor, vacuum pump, extruder, tile cutter, unloading machine, tile pressing machine, main engine and tile conveyor, when parking, stop the extruder first, and then stop other equipment.
0531-69959201
lqg18653457231
+86-18653457231
No 12111,Jingshi Road, Lixia District, Jinan City, Shandong Province. P.R. China
Professional customer service team, professional after-sale services create a comprehensive high-quality, advanced technology, reliable products, which gives you a strong sense of security.
Professionals, professional skills and precision equipments insure that we can provide you with professional product customization service.
The best quality products, strict quality control system and good reputations established Saigao product's irreplaceable place.
Superb technical team with continuous technological innovation, closely follow the market's trend help you to create the highest performance products.